HVSI Project Timeline

The below table represents the project timeline for Improving Concrete Pump Road Safety, a joint project undertaken by the Concrete Pumping Association of Australia & Tiger Spider through the National Heavy Vehicle Regulator's (NHVR) latest safety program, the Heavy Vehicle Safety Initiative.

If you are interested in becoming involved with this project or you believe your organisation, department, task force etc, has a vested interest in the deliverable outcomes of this project, don't hesitate to reach out using the contact details at the bottom of this page.

 

Project Stage

Resources

Timeframe

1

Literature review, market scan 

Tiger Spider/CPAA

31 January 2022

2

Fleet performance and risks

Tiger Spider

28 February 2022

3

Field Testing and Operating Studies

Tiger Spider, Test Vehicles and Drivers Provided by CPAA Members

30 April 2022

4

Guidelines and Standards

Tiger Spider/CPAA

30 June 2022

5

Training

Tiger Spider/CPAA

31 August 2022

6

Final Report to NHVR

Tiger Spider/CPAA

30 September 2022

 


CONTACT

   


Our Premium Sponsors

  • Antec Concrete
  • Callaghan Concrete Pumps
  • CPE Concrete Pump Engineering
  • Equipcon
  • Flowcrete Group
  • JR Equipment
  • Putzmeister
  • Rapid Applications Group LLC
  • Schwing Australia
  • W Win Engineering